# How long does it take to get an electricity connection?

**It typically takes 114 days, and anywhere from 114 days to 114 days (Afghanistan, 2019).** (Source: MainMesh, updated 2026-10-15)

| Estimate | Region | Year | Low | Typical | High | Source type |
|---|---|---|---|---|---|---|
| Time to get an electricity connection | Afghanistan | 2019 | 114 days | 114 days | 114 days | Document |
| Time to get an electricity connection | Albania | 2019 | 71 days | 71 days | 71 days | Document |
| Time to get an electricity connection | Algeria | 2019 | 84 days | 84 days | 84 days | Document |
| Time to get an electricity connection | Angola | 2019 | 97 days | 97 days | 97 days | Document |
| Time to get an electricity connection | Antigua and Barbuda | 2019 | 42 days | 42 days | 42 days | Document |
| Time to get an electricity connection | Argentina | 2019 | 92 days | 92 days | 92 days | Document |
| Time to get an electricity connection | Armenia | 2019 | 72 days | 72 days | 72 days | Document |
| Time to get an electricity connection | Australia | 2019 | 75 days | 75 days | 75 days | Document |
| Time to get an electricity connection | Austria | 2019 | 23 days | 23 days | 23 days | Document |
| Time to get an electricity connection | Azerbaijan | 2019 | 38 days | 38 days | 38 days | Document |
| Time to get an electricity connection | Bahamas, The | 2019 | 67 days | 67 days | 67 days | Document |
| Time to get an electricity connection | Bahrain | 2019 | 69 days | 69 days | 69 days | Document |
| Time to get an electricity connection | Bangladesh | 2019 | 124.46 days | 124.46 days | 124.46 days | Document |
| Time to get an electricity connection | Barbados | 2019 | 78 days | 78 days | 78 days | Document |
| Time to get an electricity connection | Belarus | 2019 | 105 days | 105 days | 105 days | Document |
| Time to get an electricity connection | Belgium | 2019 | 171 days | 171 days | 171 days | Document |
| Time to get an electricity connection | Belize | 2019 | 60 days | 60 days | 60 days | Document |
| Time to get an electricity connection | Benin | 2019 | 90 days | 90 days | 90 days | Document |
| Time to get an electricity connection | Bhutan | 2019 | 61 days | 61 days | 61 days | Document |
| Time to get an electricity connection | Bolivia | 2019 | 36 days | 36 days | 36 days | Document |
| Time to get an electricity connection | Bosnia and Herzegovina | 2019 | 69 days | 69 days | 69 days | Document |
| Time to get an electricity connection | Botswana | 2019 | 77 days | 77 days | 77 days | Document |
| Time to get an electricity connection | Brazil | 2019 | 128.49 days | 128.49 days | 128.49 days | Document |
| Time to get an electricity connection | Brunei Darussalam | 2019 | 25 days | 25 days | 25 days | Document |
| Time to get an electricity connection | Bulgaria | 2019 | 262 days | 262 days | 262 days | Document |
| Time to get an electricity connection | Burkina Faso | 2019 | 169 days | 169 days | 169 days | Document |
| Time to get an electricity connection | Burundi | 2019 | 158 days | 158 days | 158 days | Document |
| Time to get an electricity connection | Cabo Verde | 2019 | 81 days | 81 days | 81 days | Document |
| Time to get an electricity connection | Cambodia | 2019 | 179 days | 179 days | 179 days | Document |
| Time to get an electricity connection | Cameroon | 2019 | 64 days | 64 days | 64 days | Document |
| Time to get an electricity connection | Canada | 2019 | 137 days | 137 days | 137 days | Document |
| Time to get an electricity connection | Central African Republic | 2019 | 98 days | 98 days | 98 days | Document |
| Time to get an electricity connection | Chad | 2019 | 67 days | 67 days | 67 days | Document |
| Time to get an electricity connection | Chile | 2019 | 43 days | 43 days | 43 days | Document |
| Time to get an electricity connection | China | 2019 | 32 days | 32 days | 32 days | Document |
| Time to get an electricity connection | Colombia | 2019 | 88 days | 88 days | 88 days | Document |
| Time to get an electricity connection | Comoros | 2019 | 120 days | 120 days | 120 days | Document |
| Time to get an electricity connection | Congo, Dem. Rep. | 2019 | 44 days | 44 days | 44 days | Document |
| Time to get an electricity connection | Congo, Rep. | 2019 | 134 days | 134 days | 134 days | Document |
| Time to get an electricity connection | Costa Rica | 2019 | 39 days | 39 days | 39 days | Document |
| Time to get an electricity connection | Croatia | 2019 | 65 days | 65 days | 65 days | Document |
| Time to get an electricity connection | Cyprus | 2019 | 137 days | 137 days | 137 days | Document |
| Time to get an electricity connection | Denmark | 2019 | 38 days | 38 days | 38 days | Document |
| Time to get an electricity connection | Djibouti | 2019 | 52 days | 52 days | 52 days | Document |
| Time to get an electricity connection | Dominica | 2019 | 61 days | 61 days | 61 days | Document |
| Time to get an electricity connection | Dominican Republic | 2019 | 67 days | 67 days | 67 days | Document |
| Time to get an electricity connection | Ecuador | 2019 | 74 days | 74 days | 74 days | Document |
| Time to get an electricity connection | Egypt, Arab Rep. | 2019 | 53 days | 53 days | 53 days | Document |
| Time to get an electricity connection | El Salvador | 2019 | 65 days | 65 days | 65 days | Document |
| Time to get an electricity connection | Equatorial Guinea | 2019 | 106 days | 106 days | 106 days | Document |
| Time to get an electricity connection | Eritrea | 2014 | 59 days | 59 days | 59 days | Document |
| Time to get an electricity connection | Estonia | 2019 | 91 days | 91 days | 91 days | Document |
| Time to get an electricity connection | Eswatini | 2019 | 125 days | 125 days | 125 days | Document |
| Time to get an electricity connection | Ethiopia | 2019 | 95 days | 95 days | 95 days | Document |
| Time to get an electricity connection | Fiji | 2019 | 81 days | 81 days | 81 days | Document |
| Time to get an electricity connection | Finland | 2019 | 42 days | 42 days | 42 days | Document |
| Time to get an electricity connection | France | 2019 | 53 days | 53 days | 53 days | Document |
| Time to get an electricity connection | Gabon | 2019 | 148 days | 148 days | 148 days | Document |
| Time to get an electricity connection | Gambia, The | 2019 | 101 days | 101 days | 101 days | Document |
| Time to get an electricity connection | Georgia | 2019 | 71 days | 71 days | 71 days | Document |
| Time to get an electricity connection | Germany | 2019 | 28 days | 28 days | 28 days | Document |
| Time to get an electricity connection | Ghana | 2019 | 55 days | 55 days | 55 days | Document |
| Time to get an electricity connection | Greece | 2019 | 51 days | 51 days | 51 days | Document |
| Time to get an electricity connection | Grenada | 2019 | 38 days | 38 days | 38 days | Document |
| Time to get an electricity connection | Guatemala | 2019 | 44 days | 44 days | 44 days | Document |
| Time to get an electricity connection | Guinea | 2019 | 69 days | 69 days | 69 days | Document |
| Time to get an electricity connection | Guinea-Bissau | 2019 | 257 days | 257 days | 257 days | Document |
| Time to get an electricity connection | Guyana | 2019 | 82 days | 82 days | 82 days | Document |
| Time to get an electricity connection | Haiti | 2019 | 60 days | 60 days | 60 days | Document |
| Time to get an electricity connection | Honduras | 2019 | 39 days | 39 days | 39 days | Document |
| Time to get an electricity connection | Hungary | 2019 | 257 days | 257 days | 257 days | Document |
| Time to get an electricity connection | Iceland | 2019 | 22 days | 22 days | 22 days | Document |
| Time to get an electricity connection | India | 2019 | 52.85 days | 52.85 days | 52.85 days | Document |
| Time to get an electricity connection | Indonesia | 2019 | 32.24 days | 32.24 days | 32.24 days | Document |
| Time to get an electricity connection | Iran, Islamic Rep. | 2019 | 77 days | 77 days | 77 days | Document |
| Time to get an electricity connection | Iraq | 2019 | 51 days | 51 days | 51 days | Document |
| Time to get an electricity connection | Ireland | 2019 | 85 days | 85 days | 85 days | Document |
| Time to get an electricity connection | Israel | 2019 | 102 days | 102 days | 102 days | Document |
| Time to get an electricity connection | Italy | 2019 | 75 days | 75 days | 75 days | Document |
| Time to get an electricity connection | Jamaica | 2019 | 95 days | 95 days | 95 days | Document |
| Time to get an electricity connection | Japan | 2019 | 80.9 days | 80.9 days | 80.9 days | Document |
| Time to get an electricity connection | Jordan | 2019 | 55 days | 55 days | 55 days | Document |
| Time to get an electricity connection | Kazakhstan | 2019 | 71 days | 71 days | 71 days | Document |
| Time to get an electricity connection | Kenya | 2019 | 97 days | 97 days | 97 days | Document |
| Time to get an electricity connection | Kiribati | 2019 | 97 days | 97 days | 97 days | Document |
| Time to get an electricity connection | Korea, Rep. | 2019 | 13 days | 13 days | 13 days | Document |
| Time to get an electricity connection | Kosovo | 2019 | 36 days | 36 days | 36 days | Document |
| Time to get an electricity connection | Kuwait | 2019 | 49 days | 49 days | 49 days | Document |
| Time to get an electricity connection | Kyrgyz Republic | 2019 | 111 days | 111 days | 111 days | Document |
| Time to get an electricity connection | Lao PDR | 2019 | 87 days | 87 days | 87 days | Document |
| Time to get an electricity connection | Latvia | 2019 | 107 days | 107 days | 107 days | Document |
| Time to get an electricity connection | Lebanon | 2019 | 89 days | 89 days | 89 days | Document |
| Time to get an electricity connection | Lesotho | 2019 | 114 days | 114 days | 114 days | Document |
| Time to get an electricity connection | Liberia | 2019 | 482 days | 482 days | 482 days | Document |
| Time to get an electricity connection | Libya | 2019 | 118 days | 118 days | 118 days | Document |
| Time to get an electricity connection | Liechtenstein | 2019 | 52 days | 52 days | 52 days | Document |
| Time to get an electricity connection | Lithuania | 2019 | 82 days | 82 days | 82 days | Document |
| Time to get an electricity connection | Luxembourg | 2019 | 56 days | 56 days | 56 days | Document |
| Time to get an electricity connection | Madagascar | 2019 | 450 days | 450 days | 450 days | Document |
| Time to get an electricity connection | Malawi | 2019 | 127 days | 127 days | 127 days | Document |
| Time to get an electricity connection | Malaysia | 2019 | 24 days | 24 days | 24 days | Document |
| Time to get an electricity connection | Maldives | 2019 | 75 days | 75 days | 75 days | Document |
| Time to get an electricity connection | Mali | 2019 | 120 days | 120 days | 120 days | Document |
| Time to get an electricity connection | Malta | 2019 | 105 days | 105 days | 105 days | Document |
| Time to get an electricity connection | Marshall Islands | 2019 | 67 days | 67 days | 67 days | Document |
| Time to get an electricity connection | Mauritania | 2019 | 67 days | 67 days | 67 days | Document |
| Time to get an electricity connection | Mauritius | 2019 | 67 days | 67 days | 67 days | Document |
| Time to get an electricity connection | Mexico | 2019 | 100.44 days | 100.44 days | 100.44 days | Document |
| Time to get an electricity connection | Micronesia, Fed. Sts. | 2019 | 105 days | 105 days | 105 days | Document |
| Time to get an electricity connection | Moldova | 2019 | 87 days | 87 days | 87 days | Document |
| Time to get an electricity connection | Mongolia | 2019 | 79 days | 79 days | 79 days | Document |
| Time to get an electricity connection | Montenegro | 2019 | 131 days | 131 days | 131 days | Document |
| Time to get an electricity connection | Morocco | 2019 | 31 days | 31 days | 31 days | Document |
| Time to get an electricity connection | Mozambique | 2019 | 40 days | 40 days | 40 days | Document |
| Time to get an electricity connection | Myanmar | 2019 | 70 days | 70 days | 70 days | Document |
| Time to get an electricity connection | Namibia | 2019 | 37 days | 37 days | 37 days | Document |
| Time to get an electricity connection | Nepal | 2019 | 49 days | 49 days | 49 days | Document |
| Time to get an electricity connection | Netherlands | 2019 | 102 days | 102 days | 102 days | Document |
| Time to get an electricity connection | New Zealand | 2019 | 58 days | 58 days | 58 days | Document |
| Time to get an electricity connection | Nicaragua | 2019 | 55 days | 55 days | 55 days | Document |
| Time to get an electricity connection | Niger | 2019 | 52 days | 52 days | 52 days | Document |
| Time to get an electricity connection | Nigeria | 2019 | 109.8 days | 109.8 days | 109.8 days | Document |
| Time to get an electricity connection | North Macedonia | 2019 | 97 days | 97 days | 97 days | Document |
| Time to get an electricity connection | Norway | 2019 | 66 days | 66 days | 66 days | Document |
| Time to get an electricity connection | Oman | 2019 | 30 days | 30 days | 30 days | Document |
| Time to get an electricity connection | Pakistan | 2019 | 112.65 days | 112.65 days | 112.65 days | Document |
| Time to get an electricity connection | Palau | 2019 | 125 days | 125 days | 125 days | Document |
| Time to get an electricity connection | Panama | 2019 | 35 days | 35 days | 35 days | Document |
| Time to get an electricity connection | Papua New Guinea | 2019 | 66 days | 66 days | 66 days | Document |
| Time to get an electricity connection | Paraguay | 2019 | 67 days | 67 days | 67 days | Document |
| Time to get an electricity connection | Peru | 2019 | 67 days | 67 days | 67 days | Document |
| Time to get an electricity connection | Philippines | 2019 | 37 days | 37 days | 37 days | Document |
| Time to get an electricity connection | Poland | 2019 | 113 days | 113 days | 113 days | Document |
| Time to get an electricity connection | Portugal | 2019 | 65 days | 65 days | 65 days | Document |
| Time to get an electricity connection | Qatar | 2019 | 44 days | 44 days | 44 days | Document |
| Time to get an electricity connection | Romania | 2019 | 174 days | 174 days | 174 days | Document |
| Time to get an electricity connection | Russian Federation | 2019 | 40.7 days | 40.7 days | 40.7 days | Document |
| Time to get an electricity connection | Rwanda | 2019 | 30 days | 30 days | 30 days | Document |
| Time to get an electricity connection | Samoa | 2019 | 34 days | 34 days | 34 days | Document |
| Time to get an electricity connection | San Marino | 2019 | 38 days | 38 days | 38 days | Document |
| Time to get an electricity connection | Saudi Arabia | 2019 | 35 days | 35 days | 35 days | Document |
| Time to get an electricity connection | Senegal | 2019 | 68 days | 68 days | 68 days | Document |
| Time to get an electricity connection | Serbia | 2019 | 125 days | 125 days | 125 days | Document |
| Time to get an electricity connection | Seychelles | 2019 | 52 days | 52 days | 52 days | Document |
| Time to get an electricity connection | Sierra Leone | 2019 | 82 days | 82 days | 82 days | Document |
| Time to get an electricity connection | Singapore | 2019 | 26 days | 26 days | 26 days | Document |
| Time to get an electricity connection | Slovak Republic | 2019 | 89 days | 89 days | 89 days | Document |
| Time to get an electricity connection | Slovenia | 2019 | 38 days | 38 days | 38 days | Document |
| Time to get an electricity connection | Solomon Islands | 2019 | 53 days | 53 days | 53 days | Document |
| Time to get an electricity connection | South Africa | 2019 | 109 days | 109 days | 109 days | Document |
| Time to get an electricity connection | South Sudan | 2014 | 468 days | 468 days | 468 days | Document |
| Time to get an electricity connection | Spain | 2019 | 95 days | 95 days | 95 days | Document |
| Time to get an electricity connection | Sri Lanka | 2019 | 100 days | 100 days | 100 days | Document |
| Time to get an electricity connection | St. Kitts and Nevis | 2019 | 18 days | 18 days | 18 days | Document |
| Time to get an electricity connection | St. Lucia | 2019 | 26 days | 26 days | 26 days | Document |
| Time to get an electricity connection | St. Vincent and the Grenadines | 2019 | 52 days | 52 days | 52 days | Document |
| Time to get an electricity connection | Sudan | 2019 | 70 days | 70 days | 70 days | Document |
| Time to get an electricity connection | Suriname | 2019 | 113 days | 113 days | 113 days | Document |
| Time to get an electricity connection | Sweden | 2019 | 52 days | 52 days | 52 days | Document |
| Time to get an electricity connection | Switzerland | 2019 | 39 days | 39 days | 39 days | Document |
| Time to get an electricity connection | Syrian Arab Republic | 2019 | 146 days | 146 days | 146 days | Document |
| Time to get an electricity connection | Tajikistan | 2019 | 98 days | 98 days | 98 days | Document |
| Time to get an electricity connection | Tanzania | 2019 | 105 days | 105 days | 105 days | Document |
| Time to get an electricity connection | Thailand | 2019 | 30 days | 30 days | 30 days | Document |
| Time to get an electricity connection | Timor-Leste | 2019 | 93 days | 93 days | 93 days | Document |
| Time to get an electricity connection | Togo | 2019 | 66 days | 66 days | 66 days | Document |
| Time to get an electricity connection | Tonga | 2019 | 42 days | 42 days | 42 days | Document |
| Time to get an electricity connection | Trinidad and Tobago | 2019 | 61 days | 61 days | 61 days | Document |
| Time to get an electricity connection | Tunisia | 2019 | 65 days | 65 days | 65 days | Document |
| Time to get an electricity connection | Uganda | 2019 | 66 days | 66 days | 66 days | Document |
| Time to get an electricity connection | Ukraine | 2019 | 267 days | 267 days | 267 days | Document |
| Time to get an electricity connection | United Arab Emirates | 2019 | 7 days | 7 days | 7 days | Document |
| Time to get an electricity connection | United Kingdom | 2019 | 46 days | 46 days | 46 days | Document |
| Time to get an electricity connection | United States | 2019 | 89.6 days | 89.6 days | 89.6 days | Document |
| Time to get an electricity connection | Uruguay | 2019 | 48 days | 48 days | 48 days | Document |
| Time to get an electricity connection | Uzbekistan | 2019 | 88 days | 88 days | 88 days | Document |
| Time to get an electricity connection | Vanuatu | 2019 | 120 days | 120 days | 120 days | Document |
| Time to get an electricity connection | Venezuela, RB | 2019 | 208 days | 208 days | 208 days | Document |
| Time to get an electricity connection | West Bank and Gaza | 2019 | 47 days | 47 days | 47 days | Document |
| Time to get an electricity connection | Yemen, Rep. | 2014 | 110 days | 110 days | 110 days | Document |
| Time to get an electricity connection | Zambia | 2019 | 117 days | 117 days | 117 days | Document |
| Time to get an electricity connection | Zimbabwe | 2019 | 106 days | 106 days | 106 days | Document |

Days needed to get a new commercial electricity connection, for each country (World Bank Doing Business).

Days to complete all steps to connect a standard warehouse to the electricity grid. The World Bank discontinued the Doing Business report in 2021, so these figures come from its last editions (2019 or 2020 per country) and the year is shown on each card. They describe the largest business city and a standard case study, not every situation.

Canonical: https://mainmesh.com/time/electricity-connection-time