Skip to content
Sample data is switched on: pages marked “Sample data” contain illustrative numbers, not verified figures.

Sample data. These numbers are illustrative placeholders and have not been verified against a source.

How long does it take to build a house?

From permits to move-in, a new build takes many months and is often delayed by weather and supply.

It typically takes 12 months, and anywhere from 8 months to 20 months (US, 2026).

Save 3 views

Permit to move-in

US · 2026

12 months typical

Source: PLACEHOLDER: replace with a verified source

Design and permitting can take as long as construction. Weather, material and labour availability and inspections all affect the schedule.

Custom homes take longer than production builds, and changes after construction starts add delays.

Last updated · How we get these numbers